Leshan-Xichang Expressway Project

Leshan-Xichang Expressway Project

Date:2026-06-08

Project Name:Leshan-Xichang Expressway Project K2 Section

Project Unit:China Railway 18th Bureau Group Tunnel Engineering Co., Ltd

Project Description:The Leshan–Xichang Expressway K2 Project, undertaken by China Railway 18th Bureau Group, focuses on the construction of the exit section of the Daliangshan No. 1 Tunnel. The tunnel has a total length of 15.3 km, with a TBM excavation length of 10.68 km and a cutting diameter of 7.93 meters.

Project Equipment:"Yuecheng Liangshan" TBM

Supply Time: 2020.11.25-2022.11.25

Geological Condition:TBM passes through plagioclase granite (with a uniaxial compressive strength of 120-150 MPa and a quartz content of 30%), fault fracture zones, and areas of high water inflow

Cutter Solution:Customized designs match Daliangshan's extreme geological conditions, conducting joint technical efforts to overcome construction bottlenecks, ensuring on-site reliability to reduce downtime, and contributing to industry-wide technological advancement.

Located deep in the Daliangshan Mountains with difficult logistics and tight construction windows, the company established a "resident service + regional emergency" dual support system, focusing on rapid response and efficient problem-solving to ensure continuous TBM tunneling.

Project Results:These innovations directly enabled the "Yuecheng Liangshan" TBM to set industry records of 49.12 meters of daily advance and 730.2 meters of monthly advance.