Beibu Gulf Water Transfer Project

Beibu Gulf Water Transfer Project

Date:2026-06-08

Project Name:Guangdong Circum-Beibu Gulf Project A2 Section

Project Unit:China Railway 18th Bureau Group Tunnel Engineering Co., Ltd

Geological Condition:Mostly extremely hard rocks, dark in color, and exceptionally hard in texture. The rocks have good overall properties but are difficult to break.

Project Description:The A2 Section Project is located in western Guangdong Province, involving the construction of the Dafang water conveyance tunnel with a total length of 21.3 kilometers, including 11.531 kilometers of TBM tunneling. To cope with complex geological conditions, the project employs a combination of drill-and-blast and TBM tunneling methods. The "Yuehai Huanbei No. 1" TBM, with an excavation diameter of 9.4 meters, a total length of 160 meters, and a weight of approximately 2,000 tons, provides strong support for the rapid advancement of tunnel construction.

Cutter Solution:The Guangdong Circum-Beibu Gulf Water Resources Allocation Project involves complex geological conditions such as long-distance tunneling through hard rock and mixed soft–hard strata. The Company has established a full life-cycle management system covering cutter design, R&D, and selection for these strata.

Product Supply:19 inch single disc cutters, 17 inch twin disc cutter, TBM spare parts, on-site cutter shop services.

微信图片(不用宣传册)1

Copyright ©2011-2028 Qingyue Heavy Industry Co., Ltd. All rights reserved